Description

We were asked to provide a new training room building for a steel fabrication factory for use as an induction room. The building had to match the colour scheme of there existing warehouse and contain a gable end door. The building was manufactured and installed in 3 weeks from receipt of order.


Unit Specifications

The building they asked for was a new 24' x 10' portable cabin.

Exterior Finish - Plastic coated steel (Plastisol-steel)

Interior Finish: Vinyl-faced plasterboard lined interior.

Flooring: Dark blue carpet flooring

Windows: Double glazed windows with uPVC frames

Layout: Lobby and teaching area.


Delivery

We used a local haulage company to deliver the building, using their Hi-Ab crane we placed the building in the desired location.